It all starts with the customers briefing on what are the main objectives, Air, Nitrox, Trimix and which blend % is desired.

The volume of production and cycles (from concentrated supply in a short period of time or a paced delivery during 24/7), along with the location's characteristics (fixed, itinerant, remote non-support available, etc.).

Operator’s knowledge & proficiency (training or Expat operator available) and desired intervention (from tunable systems to simply full-auto thus reducing operator’s intervention to a minimum).



This specification process, far more detailed than described, will lead to the components needed like:

• Generator Power & Built in Diesel Tank
• Fuel Filtering Systems (particles remover & water/oil separator & pumps/valves)
• Water purification systems (reverse osmosis / desalination)
• Accumulating batteries and size and number of solar panels
• Container Self Lifting System (mechanical or hydraulic eliminates the need of a crane/forklift to load into a truck)
• Insulation
• AVAC (Air Ventilation / Air Conditioning)
• Living Platform (in multi-pods setup, with dorm/kitchen/WC)
• Access doors positioning
• Storage Rooms/Compartments
• Interior Illumination
• Exterior Working Lights
• Access Stairs
• Hydraulic Platform
• Hydraulic Tanks Cart Lift
• Air / Blending System components dimensioning:
• High Pressure Air Compressor
• Low Pressure Compressor
• Nitrox Membrane System
• Air Dryer
• Storage distribution
• Cascade Pressure Reducing Set
• Filling Panel
• High Pressure Circuit (Piping, Valves, Inlets, Outlets, Purges, etc.)
• Air Filtration System
• Redundancy Equipment (secondary small compressor for example)
• CO2 Elimination System
• Auxiliary Air Systems (tires filling, buoys, cleaning, etc.)




When this process is finished, taking into consideration the interaction between components and fuel/electricity consumptions and needs, it is time to find the best fitting option – Meaning, the smallest enclosure possible maintaining full operation and maintenance capability without disassemble.

After this step it is necessary to advance to the handling requirements, not one hand, two hands or no hands and no teeth but instead how it will be transported, moved, removed and carried. It can be hoisted, forklifted, fitted with a self lifting system (integrated or adaptable) or even pushed rolled, equipped with twistlock and corner casting, again mission requirements dependent.



The finishing is then applied according to previous customer choice, from two components polyurethane paiting to 8mm thick projected cork for extreme insulation, please remember that the worse enemy of an air compressor is the heat… and the cold – neither it can be operated above 40ºc or started below 5ºc in order to assure proper lubrication – so ambient heating may be required prior to start it.

One step possible is the integration with a vehicle, where the POD Systems (mainly the solar panels or generator) can supply also energy to the truck batteries. The commands of the lightings can also be integrated, as well as the water tank and diesel pumps.

Customer is invited then to verify our load tests of the equipment and loading to its destination.

We can hire a ready-to-deploy unit (with or without truck) or we can built one to fit your complete specifications so please contact us with your needs.